Mar 192009
 

I believe this becomes first priority now – I need to have a plan to manage all INT/QA environments to make sure they are following production engineer’s standard so that we can reproduce/verify production issues without any sort of hacks.

Won’t be a easy job, but it will be fun, it will include how to cooperate with SecoDB, how to extract most meaningful data, and how to maintain distro pipeline or quick (hourly?) bootstrap.

I need to make sure I have enough bandwidth dealing with all 3 projects I have, and more important, I need to have a preference of projects so in case I have to give up some projects, it won’t take me too much time to make the decision.

Be prepared is always a good thing.

 Posted by at 00:09